Facultative wastewater treatment lagoons with depths of 3 and 5 ft (0.9 and 1.5 m) were operated for 8 yr with a BOD surface loading rate of 100 lb/day/acre (11.2 g/day/sq m) for each lagoon.
MINNEAPOLIS, MN--(Marketwired - November 04, 2014) - Iola, Kansas-- The 100-acre facultative lagoon system at the Iola, Kansas wastewater treatment plant was plenty big enough to meet the needs of the ...
Treatment plant upgrades of existing facultative lagoon systems are rapidly incorporating constructed artificial wetlands systems to control biochemical oxygen demand (BOD) and total suspended solids ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results